New Arrivals/Restock

Asta PowerProject Field Manual: Scheduling, Controls, Claims & Handover for Infrastructure Professionals

flash sale iconLimited Time Sale
Until the end
23
52
40

$30.87 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
New  $51.45
quantity

Product details

Management number 233348601 Release Date 2026/06/27 List Price $20.58 Model Number 233348601
Category

Asta PowerProject Field Manual: Scheduling, Controls, Claims, and Handover for Infrastructure ProfessionalsThis book is for planners, schedulers, and project controls professionals who are expected to do more than build a schedule that looks good on paper. You are expected to defend it, update it under pressure, explain it to management, and rely on it when delay, recovery, and claims become real.Asta PowerProject Field Manual is built for the environments where schedule quality actually matters: live infrastructure work, contract scrutiny, owner review, monthly reporting, delay analysis, recovery planning, handover, and closeout.Built around a full infrastructure case study, this manual shows how Asta PowerProject is used in the real world, not in a classroom and not in a generic software tutorial.Inside, you will learn how to:• Build defensible baselines from day one• Strengthen logic before weak sequencing becomes project delay• Track progress with clarity, discipline, and credibility• Read critical path and float correctly under real project pressure• Analyze delay using Time Impact Analysis and Windows Analysis• Prepare recovery schedules that stand up in serious discussions• Handle handover, takeover, and closeout without losing controlThis is not a beginner walkthrough.It is not a watered-down overview.And it is not a generic software guide.It is a working field manual for professionals whose schedules must survive real project conditions.If your schedule will be reviewed, challenged, relied on, and possibly dissected later, this book was written for you.This book is for planners, schedulers, and project controls professionals Read more

ASIN B0GWWJNRG8
ISBN13 979-8255895601
Language English
Publisher Independently published
Dimensions 7 x 0.62 x 10 inches
Item Weight 1.34 pounds
Print length 273 pages
Publication date April 11, 2026

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review